Umlazi Load Shedding Time Table 2021

In 2021, Umlazi’s load shedding followed a national schedule as managed by Eskom, with local adjustments based on demand and system constraints[1]. The area was organized into blocks, with each block subject to power cuts according to the stage of load shedding implemented.

Key Points from the Umlazi Load Shedding Schedule 2021:

  • Stage 1: Residential and commercial blocks, including parts of Umlazi, were scheduled for load shedding once every second day[1].
  • Stage 2: Load shedding occurred once daily for the affected blocks[1].
  • Stage 3: All blocks (residential, commercial, and industrial) faced daily load shedding[5].
  • Stage 4: All blocks were load-shed daily, with residential and commercial receiving an additional block on alternate days[5].
  • Each scheduled outage typically lasted 2 hours, with an extra 30 minutes added as a contingency for switching and restoration[5].

Block allocation (e.g. Umlazi South/Block B) and exact times varied, so residents needed to check specific schedules for their block, which were often published as PDFs or provided by municipal websites[3].